WCT Solutions
Services · Infrastructure

Fiber Optic
Networks.
Solutions.

From site survey to certified handover — we install, splice, and OTDR-certify singlemode and multimode fiber infrastructure that performs to standard and lasts.

OS1 · OS2 · OM3 · OM4 · OM5 — certified with Fluke OptiFiber Pro.

OS1/OS2 + OM3–OM5

Fiber standards

100%

OTDR certified

400G capable

Max bandwidth

IEC 61300-3-35

End-face standard

Fiber Standards

The Right Fiber
for the Right Link.

Singlemode or multimode, indoor or outdoor — the choice of fiber type, core count, and connector determines whether your link meets its loss budget now and remains fit for purpose as speeds increase.

OS1

Singlemode · 9/125µm

Up to 2 km

Indoor tight-buffered singlemode fiber for riser and campus inter-floor applications. Low-loss, long-reach performance within buildings.

Campus inter-floor links
Riser backbone runs
MDF to IDF connections

OS2

Singlemode · 9/125µm

10 km+

Loose-tube outdoor/OSP singlemode fiber engineered for inter-building and underground campus links requiring long reach and environmental resilience.

Inter-building links
Underground campus routes
Outside plant (OSP)

OM3

Multimode · 50/125µm

300 m @ 10G

Laser-optimised multimode fiber suitable for 10G data centre horizontal and server room link applications at moderate distances.

Data centre horizontal
Server room links
10G switch interconnects

OM4 / OM5

Multimode · 50/125µm

550 m @ 10G

OM4 delivers 10G to 550 m and 100G to 150 m. OM5 wideband multimode extends to 100G+ via SWDM, ideal for ultra-high-density hyperscale data centres.

High-speed data centre
Storage area networks
Ultra-high-density / hyperscale
Connector Types

LC · SC · MPO/MTP · ST

LC

Lucent Connector

The dominant data centre and enterprise connector. Small form factor, push-pull latch. Used on SFP/SFP+ transceivers, patch panels, and high-density installations.

SC

Subscriber Connector

Square push-pull connector with excellent repeatability. Common in older installations, telco, and outside plant termination. Still widely specified.

MPO/MTP

Multi-Fibre Push-On

Multi-fibre connector carrying 8, 12, or 24 fibres in a single push-fit body. Used in high-density trunk cable systems, pre-terminated backbone, and 40G/100G+ parallel optics.

ST

Straight Tip

Bayonet-style connector used in legacy multimode installations, campus environments, and some industrial applications. Robust, but being replaced by LC/SC in new installs.

Scope of Work

Everything Included.
Nothing Missed.

Our fiber optic engagements cover the complete lifecycle — from the first site walk to the final OTDR certification report. No scope gaps, no corners cut.

01

Site Survey & Route Planning

Underground routes, riser paths, and duct availability assessed on-site. Every proposed fiber route is walked, measured, and documented before design begins.

02

Fiber Design & Specification

Core count, fiber type, connector selection, and loss budget calculation produced for every link. Design accounts for splices, connectors, bend losses, and future headroom.

03

Cable Installation

Internal installation via trunking and conduit. Underground via duct or direct-burial. Aerial span where required. All routes correctly supported, labelled, and documented.

04

Fusion Splicing

Arc-fusion splicing to less than 0.1 dB per splice. Every splice is heat-sleeved and properly housed in a splice tray within a suitable enclosure or termination point.

05

Mechanical Termination

Field-terminated connectors installed where fusion splicing is not practical — using pre-polished ferrule termination kits for a clean, reliable end-face every time.

06

End-Face Inspection

Every connector end-face cleaned and inspected to IEC 61300-3-35 before testing. Contaminated connectors are the number one cause of fiber link failure — we eliminate that risk.

07

OTDR Testing

Bi-directional OTDR traces captured with the Fluke Networks OptiFiber Pro. Every event — connector, splice, bend — is identified, logged, and measured.

08

Optical Loss Testing

Insertion loss measured with a calibrated light source and power meter. Results validated against TIA/ISO loss budgets for the specific link type and length.

09

Certification Reports

Full OTDR trace files and pass/fail certification reports generated via Fluke LinkWare for every link. Delivered digitally at project handover.

10

As-Built Documentation

Fiber schedule, splice records, route drawings, and termination schedules compiled and delivered at handover. Complete record of the installed infrastructure.

Environments

Every Environment.
Properly Fibered.

From underground campus runs to ultra-high-density data centres — we've installed fiber in demanding environments and understand the constraints, standards, and workmanship that each one requires.

Campus Backbones

Inter-building OS2 singlemode for long-reach campus links, riser backbone cabling between floors, and MDF to IDF distribution fiber — the backbone your network depends on.

What we install in this environment

Inter-building OS2 singlemode links
Riser backbone between floors
MDF to IDF distribution fiber
Multi-site campus ring topologies
OTDR Certification

Every Link Traced.
Every Event Logged.

We use the Fluke Networks OptiFiber Pro OTDR — the industry standard for fiber certification. Every link is tested bi-directionally, with results averaged per TIA and ISO methodology.

Bi-directional OTDR traces on every link
Every event identified, measured, and logged
Results averaged per TIA-526-14 / ISO/IEC 14763-3
Full trace files delivered via Fluke LinkWare
Pass/fail against design loss budget

OTDR event log — sample link

EventDescriptionDistanceLossResult
Event 1Launch connector0 m0.08 dBPASS
Event 2Fusion splice245 m0.04 dBPASS
Event 3Fusion splice612 m0.06 dBPASS
Event 4End connector0.09 dBPASS

Total link loss

Budget: 1.5 dB

0.27 dB

PASS

Sample — tested bi-directionally, results averaged per TIA/ISO

Why WCT

Fiber Done
Properly.

A fiber link is only as good as its weakest splice, dirtiest connector, or missing test. We eliminate all three — and prove it with documentation you can rely on.

Talk to Our Team

Fusion-Spliced Quality

Less than 0.1 dB per splice, every time. Every splice is heat-sleeved and properly housed in a splice tray — not left loose in an enclosure.

Bi-Directional Testing

We test every link in both directions and average the results — the correct method per TIA and ISO standards, not a shortcut.

End-Face Inspection

Every connector is cleaned and inspected against IEC 61300-3-35 before testing. Dirty connectors are the number one failure cause in fiber — we eliminate the risk.

Complete Handover Pack

OTDR traces, insertion loss reports, splice records, and as-built drawings — all delivered at handover, not chased for weeks afterwards.

Start Your Project

Fiber That Performs.
Certified to Prove It.

Tell us your site, your routes, and your bandwidth requirements. We'll scope the job, specify the right fiber type, and deliver a fixed-price proposal — with OTDR certification included as standard.